Front lighting devices

Front lighting device certification support in Vietnam

LotusTSE supports manufacturers, suppliers and importers in defining the lighting function, light source, optical system, housing, variants, markings and vehicle installation context; reviewing available evidence; and planning testing, Vietnamese certification documentation and COP activities for front lighting devices.

Discuss a project requirement
01

Who this service is for

Manufacturers, component suppliers and importers preparing a new front lighting devices type, product range, variant or engineering change for Vietnam.

02

When the service is needed

  • A new product or range is planned for the Vietnamese market.
  • Evidence under UN Regulation No. 149 and relevant installation requirements, when applicable exists, but its relevance and scope require review.
  • A product family and representative sample must be defined.
  • A change may affect testing, certification documentation, markings or COP.
03

What the customer should prepare

  • Device functions and intended vehicle applications.
  • Optical, mechanical and electrical drawings, light-source data and markings.
  • Test reports, UNECE approvals and extension documents.
  • Variant matrix, production site and proposed sample.
04

What LotusTSE does

  • Define the type or family boundary from the actual lighting function, light source, optical system, housing, variants, markings and vehicle installation context.
  • Map the applicable requirements under QCVN 125:2024/BGTVT and review evidence under UN Regulation No. 149 and relevant installation requirements, when applicable.
  • Check traceability across product, marking, test report, approval document and approval scope.
  • Identify gaps, representative samples, test work, technical-file actions and relevant COP controls.
05

What the customer receives

  • Product-scope and family matrix.
  • Requirements-to-evidence matrix with verification points and gaps.
  • Representative-sample and test-plan proposal.
  • Reviewed technical-document list and prioritized next actions.
06

Risks identified and reduced

The review helps identify treating unlike lighting functions as one scope, missing an approval or marking limitation, selecting an unsuitable sample, or separating the device assessment from relevant installation conditions, reducing avoidable repeat work and late documentation changes. UNECE evidence is reviewed case by case and is not presented as automatically accepted in Vietnam.

07

Project coordination

How the project is managed

The parties agree the scope, deliverables, responsibilities and indicative milestones before work starts. A LotusTSE technical focal point tracks work items, information awaiting customer input, identified risks and next actions. Milestones that depend on an authority, laboratory or other external organization are updated against actual status.

08

Start a project

What to send for an initial review

Send a product or facility description, the proposed configuration or scope, country of origin, available technical evidence, the issue to be resolved and the target timing. LotusTSE will identify the most important missing inputs before proposing the scope of services, deliverables, coordination method, indicative schedule and fees.

Start with the actual configuration

Planning a motor-vehicle project in Vietnam?

Discuss the project