Eight-step roadmap
1. Define the product, business route and target launch.
2. Identify the applicable QCVN and procedure.
3. Build the type/family/configuration map.
4. Inventory existing UNECE and other evidence.
5. Perform the evidence gap analysis.
6. Build the sample, test and COP plan.
7. Define the dossier/certification workflow and responsibility matrix.
8. Establish the pre-shipment/readiness gate and maintain change control through launch.
Basis
LEGAL REQUIREMENT: Applicable requirements must be identified from the product category, relevant QCVNs and Circulars 54/2024 and 55/2024 together with the amendments effective at the time of the project.
FACT: Different vehicles and components are subject to different QCVNs and test/type definitions; UNECE evidence must be mapped and must not be presumed automatically accepted.
Expert analysis
EXPERT INTERPRETATION: The roadmap should manage dependencies: configuration freeze → evidence readiness → sample availability → testing → dossier → external review. The critical path may change as gaps are identified.
EXPERIENCE-BASED INSIGHT: LotusTSE recommends freezing the actual configuration, evidence package and remaining Vietnam actions before shipment and applying impact/gap analysis to every change. LotusTSE commits only to deliverables within its control and does not guarantee the decision or timeline of an external authority or organization.
Recommended outputs
Regulatory applicability matrix; family map; evidence register; gap list; test/sample plan; COP plan; dossier checklist; milestones/RACI; change log.
Risks
Starting testing before the family is defined; relying on a report with the wrong scope; using a non-representative sample; late component changes; shipment before evidence review; basing the project schedule on unconfirmed external timing.
LotusTSE support
Market-entry regulatory roadmap; evidence review; testing/certification coordination; COP planning; change control.
Knowledge Graph
Service: Vehicle import or domestic manufacture/assembly; component certification; COP; testing; document review.
QCVN/Circular/UNECE: all nodes applicable to the product.
Related: Representative Samples; UNECE Evidence; Pre-shipment Checks; Family Strategy.
NEEDS VERIFICATION
Applicable regulations, effective dates, external processing steps and timelines must be updated as of the project start date.